Recent Experience

Vendor Selection Assistance

Vendor Selection Assistance

Vendor Selection Assistance

Confidential Customer:  U.S. IPP

Year Completed:  Ongoing

Project:  Recommend equipment modifications and assist with overall vendor selection for a poultry litter-fuel fired electricity generation plant ilocated in North Carolina.

Energy Recovery System

Vendor Selection Assistance

Vendor Selection Assistance

Confidential Client:  U.S. IPP

Year Completed: Ongoing

Develop methodology to capture remaining heat from steam used in Steam Coil Air Heaters and return energy to the system via use of a cyclonic separator and pumps.

Generator Load Bank Test

Vendor Selection Assistance

Bypass Conveyor Installation

Confidential Client:  Greenhouse Facility

Year Completed: 2022

Co-developed a test plan and witnessed a used generator load bank test for a client in rural Mississippi procuring a used diesel generator for their start-up business.

Bypass Conveyor Installation

Bypass Conveyor Installation

Bypass Conveyor Installation

Confidential Client:  U.S. IPP

Year Completed: 2022

Developed concept and worked closely with the plant conveyor OEM to install conveyors to eliminate bottlenecking around obsolete wood dryers at two biomass stations.

Addition of SCAH

Bypass Conveyor Installation

Phase 1 Due Diligence

Confidential Client:  U.S. IPP

Year Completed:  2022

Performed sizing, developed concept, selected vendors, and managed turnkey installation of Steam Coil Air Heaters (SCAH) for two biomass plants to eliminate cold-end corrosion.

Phase 1 Due Diligence

Bypass Conveyor Installation

Phase 1 Due Diligence

Confidential Client:  U.S. IPP

Year Completed:  2021

Project:  Investigate the suitability for reuse of an existing shuttered CFB for independent inside-the-fence power at a sand mine.

HRSG Repurpose Inspection

Boiler "Ready to Ship" Inspection

HRSG Repurpose Inspection

Confidential Client:  U.S. IPP

Year Completed: 2021

Project:  Review components in storage and assess feasibility of reuse for project located in Ohio, USA.

LEED Site Assessment

Boiler "Ready to Ship" Inspection

HRSG Repurpose Inspection

Confidential Customer:  Irish Engineering Firm

Year Completed:  2020

Project:  Travel to a remote site outside of Fortaleza, Brazil to assess the feasibility of using landfill gas (biogas) in a new facility boiler.

Boiler "Ready to Ship" Inspection

Boiler "Ready to Ship" Inspection

Boiler "Ready to Ship" Inspection

Confidential Customer:  U.S. AE Firm

Year Completed:  2020

Project:  Review extent of shop work completed and ascertain readiness to ship for six (6) biomass-fired boilers being built in  Georgia for installation in southern Africa.

Additional Experience

Due Diligence Equipment Survey

Due Diligence Equipment Survey

Due Diligence Equipment Survey

Confidential Customer:  U.S. AE Firm

Year Completed:  2019

Project:  Performed a site investigation and equipment assessment for a client leading the due diligence of the potential purchase of a mothballed generation facility in S. Georgia.

Boiler Performance Assessment

Due Diligence Equipment Survey

Due Diligence Equipment Survey

Confidential Customer:  U.S. IPP

Year Completed: 2019

Project:  Collection of data from plant DCS and investigation of a boiler perfromance output, made recommendations for modifications of 2 biomass-fired boilers located in Georgia.

Refractory Failure Analysis

Due Diligence Equipment Survey

Refractory Failure Analysis

Confidential Customer:  U.S. IPP

Year Completed:  2019

Project:  Performed an equipment inspection, detailed report, and investigation of similar designs to make a recommendation for modification of a biomass-fired boiler in GA.

Fuel Testing

Project Financial Model

Refractory Failure Analysis

Confidential Customer:  U.S. IPP

Year Completed:  2019

Project:  When boiler performance deficiencies resulted in a vendor's claims of non-spec fuel, we analyzed various fuel samples using both in-house and external testing sources.

Project Financial Model

Project Financial Model

Project Financial Model

Confidential Customer:  U.S. Developer

Year Completed:  2012

Project:  Detailed project financing model including project CAPEX and OPEX vis-a-vis predicted project revenue for Year 1 and Year 20 of a biomass-fired facility in Virginia.

Market Investigation

Project Financial Model

Project Financial Model

Confidential Customer:  Italian Boiler Supplier

Year Completed:  2011

Project:  Detailed a list of suppliers (including price levels) of American-made equipment for an Italian Boiler supplier contemplating entering the US market with their product.

Past Projects Photo Gallery

    American Power Consultants LLC

    P.O. Box 3146; Alpharetta, GA 30023 U.S.A.

    +1 678 936-2318

    Copyright © 2021 American Power Consultants LLC - All Rights Reserved.

    Powered by GoDaddy

    This website uses cookies.

    We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

    Accept